Critical Infrastructure

HEPCritical Infrastructure

Critical Infrastructure | Generators | Electrical | Wartburg

When Wartburg’s hospitals, data centers, and municipal facilities need unwavering power, they trust HEP to design, install, and maintain the robust generators that keep vital systems online. Our certified technicians pair decades of field experience with cutting-edge load-management technology, ensuring seamless transitions the instant a grid fluctuation is detected. From fuel-efficient diesel units to clean natural-gas arrays, every solution is tailored for maximum uptime in Wartburg’s demanding climate.

Beyond installation, HEP offers round-the-clock remote monitoring, preventative maintenance, and rapid-response service crews stationed minutes away. That means no guessing, no downtime—just continuous, dependable electricity that protects lives, data, and critical operations when it matters most. Ready to future-proof your infrastructure? Connect with our team and discover why Wartburg counts on HEP to power resilience.

FAQs

What types of generators are best suited for critical infrastructure facilities in Wartburg?

For mission-critical sites in Wartburg—such as hospitals, 911 centers, water and wastewater plants, and public-safety buildings—we generally specify industrial-grade diesel or natural-gas standby generators in the 100 kW to 2 MW range. Diesel units offer higher power density and longer runtimes, which is ideal for extended TVA grid outages caused by severe weather. Where a continuous natural-gas supply is reliable, gas-fired generators reduce onsite fuel storage requirements and emissions. We represent Tier 4-compliant, low-emission models from leading manufacturers to meet both output and environmental targets.

How do you determine the correct generator size for my facility?

Our engineers perform a detailed load analysis that lists every essential circuit—life-safety lighting, HVAC, pumps, IT servers, etc.—and measures their starting (inrush) and running amperage. We apply NEC Article 220 demand factors, incorporate future expansion plans, and add a 20 % margin to handle transient spikes. We also consider motor starting kVA and harmonics created by VFDs. The result is a right-sized generator and automatic transfer switch (ATS) that avoids both overloads and costly oversizing.

What maintenance schedule is required to keep emergency generators compliant with Tennessee and federal regulations?

NFPA 110 and NFPA 99 mandate at least weekly visual inspections and monthly no-load exercise tests for Level 1 (critical) generators. In Wartburg, we enhance that baseline with quarterly oil sampling, semi-annual load-bank testing at 30 % nameplate, and an annual comprehensive service (fluid changes, battery conductance test, coolant pH, fuel polishing for diesel tanks, and infrared scan of switchgear). All actions are logged to meet Joint Commission, CMS, and TDEC audit requirements.

How fast can your team respond to an unplanned generator failure in Wartburg?

Our Morgan County service hub keeps factory-trained technicians on 24/7 call. Average arrival time within the Wartburg city limits is 60 minutes for emergency dispatch. We stock critical parts—control boards, voltage regulators, injectors, and filters—locally, so most repairs are completed on the first visit. If the unit is offline for more than four hours, we can deploy a rental generator from our Knoxville depot to keep your operations running.

Do you handle fuel management and automatic transfer switch integration?

Yes. For diesel systems we design UL-142 double-wall tanks with leak monitoring, day-tank setups, and remote fill stations that comply with IFC and local fire-marshal guidelines. We also offer continuous fuel-polishing systems to prevent microbial growth. Our UL508A panel shop builds both open-transition and closed-transition ATS units up to 4000 A, complete with load-shed/priority controls, SCADA gateways, and remote annunciators, ensuring seamless switchover without back-feeding the TVA grid.

Can you assist with permitting and coordination with the local utility for a new generator installation?

Absolutely. We prepare electrical one-lines, short-circuit and coordination studies, and submit them to Volunteer Energy Cooperative (the local distributor for TVA) for interconnection approval. We also handle TDEC air-quality permitting for generators over 300 kW, acquire building and fuel-storage permits from Morgan County Codes, and schedule the final witness test with the state electrical inspector. This turnkey approach removes administrative burdens so you can focus on core operations.

HEP
Book Online
(423) 819-7773