- HEP
- Energy Bills
Energy Bills
Energy Bills | Solar Installation | Electrical | Strawberry Plains
Imagine opening your monthly statement and seeing the power of Tennessee sunshine slashing your costs. At HEP, we design and deliver high-efficiency solar installation solutions tailored for Strawberry Plains homes and businesses, turning rooftops and open acres into clean-energy producers. Our licensed electricians handle every detail—from a free, data-driven site assessment to seamless panel integration with your existing electrical system—so you can enjoy immediate savings and long-term peace of mind.
With decades of local experience, we know the unique weather patterns, zoning regulations, and rebate opportunities that maximize your return on investment. Choose HEP and you’ll tap into 24/7 customer support, industry-leading warranties, and transparent financing that keeps your sustainability goals within reach. Let the sun pay your energy bills while you power Strawberry Plains with brighter, greener electricity.
FAQs
How much can I expect to save on my electric bill by going solar in Strawberry Plains?
Savings depend on your roof size, shading, and current utility rate, but the average 6–8 kW residential system in Strawberry Plains produces about 8,000–11,000 kWh a year. At today’s local rate of roughly $0.11 per kWh, that offsets $880–$1,210 in utility charges annually. Over the 25- to 30-year life of the panels, that can add up to $25,000 or more in avoided electricity costs, and most homeowners see a 7- to 12-year payback period.
Does the East Tennessee climate provide enough sunshine for solar panels to work efficiently?
Yes. Strawberry Plains receives about 4.5 peak sun-hours per day on average—similar to the national median. While our region has humid summers and partly cloudy winters, today’s photovoltaic modules capture diffuse light well and lose only 10–15 % of output on overcast days. A properly oriented, shade-free array will deliver 1,200–1,400 kWh per installed kilowatt each year, which is more than enough to make solar financially viable.
How does net metering or energy buy-back work with my local utility and TVA?
Tennessee does not have traditional 1-for-1 net metering, but customers served by TVA-connected utilities (including KUB and AEC) can interconnect through TVA’s Dispersed Power Production (DPP) program. Excess power is exported to the grid and credited at TVA’s avoided-cost rate—typically 2–4 ¢/kWh—rather than the full retail rate. Because of this lower credit, most systems are sized to match daytime household usage; adding batteries lets you store surplus power for evening use and increase self-consumption.
What incentives or tax credits are available for solar installations in Strawberry Plains?
Homeowners and businesses can claim the 30 % Federal Investment Tax Credit (ITC) on the total installed cost of a solar array through 2032. Solar equipment is also exempt from Tennessee sales tax when installed by a licensed contractor, and the added property value from the system is exempt from county property taxes. Businesses may additionally utilize 5-year MACRS accelerated depreciation and, if eligible, bonus depreciation to further reduce net cost.
Will my solar array keep the lights on during a power outage?
A standard grid-tied system automatically shuts off when utility power is lost to protect line workers. To maintain power during outages, you’ll need a hybrid inverter and a battery bank (lithium-ion or LFP). These systems create a protected "backup" panel that keeps critical loads—refrigerators, lights, Wi-Fi, medical devices—running for several hours to several days, depending on battery size. Generators can also be integrated for extended backup capability.
What is the typical timeline and permitting process for a solar installation in Strawberry Plains?
1) Site assessment & proposal: 3–5 days after your initial call. 2) Engineering & final design: 1–2 weeks. 3) Permitting (county building permit and TVA interconnection approval): 2–4 weeks, though some projects clear faster. 4) Installation: 1–2 days for most residential roofs, 2–4 days for ground mounts or systems with batteries. 5) Inspection & utility meter swap: 1–3 weeks after install. In total, expect 6–10 weeks from signed contract to energization, depending on permit queues and weather.