Safety Standards

HEPSafety Standards

Safety Standards | Whole Home Rewires | Electrical | Speedwell

From aging farmhouses on Back Valley Road to modern builds overlooking Norris Lake, Speedwell homes deserve electrical systems that are as safe as they are reliable. HEP’s licensed electricians approach whole home rewires with the same rigor we bring to hospital and industrial projects—meticulous planning, premium UL-listed materials, and workmanship that exceeds NEC requirements. We map every circuit, label every breaker, and use AFCI/GFCI protection in all critical zones, reducing the risk of shocks and fires while preparing your property for today’s high-demand appliances and tomorrow’s smart-home tech.

Because rewiring can feel disruptive, we schedule in phases, keep work areas dust-free, and provide daily progress updates. When the last outlet is tested and the final inspection passed, you’ll have a safer, more efficient electrical backbone backed by HEP’s lifetime workmanship warranty—peace of mind that lets you enjoy your Speedwell home for decades to come.

FAQs

Why might my Speedwell home need a full rewire?

Older installations (usually 25–30 years or more) often contain degraded PVC or rubber-sheathed cabling, undersized earthing, or outdated fuse boxes that can’t provide modern RCD protection. Signs such as frequently tripping breakers, hot or cracked outlets, or a lack of grounding in lighting circuits indicate that the existing wiring no longer meets current safety standards (BS 7671:2018 +A2:2022). A full rewire brings the entire electrical system up to today’s load demands and greatly reduces the risk of shock and fire.

What safety standards and regulations must a whole-home rewire meet?

In Speedwell—as everywhere in England—a rewire must comply with: • BS 7671 (IET Wiring Regulations) 18th Edition for circuit design, cable selection and protective devices. • Part P of the Building Regulations, which makes most domestic electrical work notifiable to local Building Control. • The Electricity at Work Regulations 1989, which require safe design and installation. Using an NICEIC or NAPIT Approved Contractor ensures your project is automatically self-certified and registered with Building Control, and you’ll receive an Electrical Installation Certificate (EIC) plus a Building Regulations Compliance Certificate.

How long does a full rewire typically take and will I have to move out?

A standard three-bed semi-detached property in Speedwell typically takes 5–7 working days for a complete rewire, including new consumer unit, socket and lighting circuits, smoke alarms and testing. Larger or heavily customised homes can take 2–3 weeks. Although we can phase work so you retain limited power each evening, a vacant property allows faster, cleaner progress. Many clients choose to stay with friends or family for the first few dusty days when floorboards are lifted and chasing is done.

Will I receive certification after the rewire is finished?

Yes. On completion we issue: 1. Electrical Installation Certificate (EIC) describing each circuit, test results and confirming compliance with BS 7671. 2. Part P Building Regulations Compliance Certificate, lodged electronically with Bristol City Council’s Building Control on your behalf. 3. NICEIC 6-year Platinum Promise, which provides extra peace of mind that any non-compliance will be put right at no extra cost.

Can parts of my existing wiring be reused to save money?

Where existing cabling passes all insulation-resistance, polarity and earth-fault loop tests and meets current sizing and RCD protection requirements, it may legally remain in service. However, in practice cables installed before 2004 usually fall short of modern earthing or RCD standards. Our engineer will carry out a free visual inspection and, if beneficial, recommend partial rewiring (e.g., lighting only) rather than a blanket approach—keeping costs down without compromising safety.

How much disruption and mess should I expect and how is it minimised?

Rewiring is invasive: floorboards are lifted, walls are chased and sockets repositioned. We mitigate disruption by: • Using dust-control chasing machines with on-tool extraction. • Protecting carpets and furniture with adhesive film and corrugated board. • Running first-fix cabling and making good plaster in the same visit. • Providing temporary power and lighting circuits so fridges, Wi-Fi and vital appliances stay on. • Cleaning each night and removing rubble daily. After final testing we arrange for a professional plaster skimmer (if required) and can coordinate decorators to return your home to a finished state quickly.

HEP
Book Online
(423) 819-7773