Industrial Setups

HEPIndustrial Setups

Industrial Setups | Generators | Electrical | Speedwell

When uptime is mission-critical, HEP delivers. Our industrial setups bring together precision-engineered switchgear, power distribution, and high-capacity generators that start fast, run clean, and scale effortlessly with your load demands. From food-processing plants to remote mining camps, every package is factory-tested and ready for plug-and-produce performance—minimising commissioning time and maximising ROI.

Beyond robust hardware, you gain a partner obsessed with reliability. Predictive maintenance analytics, 24/7 monitoring, and rapid-response field teams keep the electrons flowing while you focus on production. Trust HEP to turn power risk into power certainty, today and for decades to come.

FAQs

What generator capacities does Speedwell offer for industrial applications?

Speedwell supplies a broad range of industrial-grade generators, from 30 kVA units for small workshops to multi-megawatt containerised systems capable of powering entire manufacturing plants or data centres. We stock standard ratings (30 kVA, 60 kVA, 125 kVA, 250 kVA, 500 kVA, 1 MVA, 2 MVA and 3 MVA) and can build custom paralleling packages that scale even higher. Our engineering team analyses your load profile and recommends the optimal configuration—single set, N+1 redundancy or synchronised fleet—to ensure uninterrupted power and the best lifecycle cost.

How do I determine the correct generator size for my facility?

Sizing starts with an accurate assessment of your maximum and average electrical loads. We review your utility bills, motor starting currents, power-factor-sensitive equipment and any future expansion plans. Using this data and industry-standard sizing software, our engineers calculate peak kVA/kW demand, select an engine/alternator combination with at least a 15 % safety margin, and verify voltage dip, harmonic distortion and transient recovery satisfy ISO 8528 guidelines. A free on-site survey is included, and you receive a full sizing report for approval before any order is placed.

Which fuel options are available and how do I choose the best one?

Speedwell offers diesel, natural gas, bi-fuel (diesel-gas) and HVO-ready generators. Diesel units deliver the highest power density and are ideal for heavy-duty, high-load applications. Natural-gas sets provide lower emissions and operating costs where pipeline gas is available. Bi-fuel systems start on diesel and transition to gas, giving fuel flexibility in areas with intermittent gas supply. HVO (hydrotreated vegetable oil) compatibility allows up to 90 % CO₂ reduction without equipment modification. Our specialists weigh your runtime requirements, fuel logistics, environmental goals and total cost of ownership to recommend the optimal choice.

How often do the generators require maintenance, and does Speedwell provide service?

Industrial generators follow a preventive maintenance schedule based on runtime hours and calendar intervals. Typical diesel sets require: 250-hour minor service (oil, filters, inspection), 500-hour major service (fluid analysis, valve adjustment) and annual comprehensive checks including load-bank testing and control-system firmware updates. Gas engines usually have 1,000-hour spark-plug and ignition inspections. Speedwell offers 24/7 service contracts with remote monitoring, OEM-trained technicians, genuine spare parts and guaranteed 4-hour on-site response in the Speedwell region to maximise uptime.

Do Speedwell generators comply with local regulations and emission standards?

Yes. All our new diesel models meet EU Stage V or U.S. EPA Tier 4-Final (where applicable) emission limits, featuring advanced after-treatment (DOC, DPF, SCR). Gas generators comply with MCPD requirements for NOₓ, CO and formaldehyde. We provide full certification packs—CE mark, Declaration of Conformity, acoustic test reports and exhaust dispersion calculations—to streamline planning permission and environmental permitting for your site.

What is the typical lead time for delivery and installation?

Standard stock units up to 500 kVA can usually be delivered within 2–3 weeks of order confirmation. Custom-built or containerised sets from 750 kVA to 3 MVA generally require 8–12 weeks, including factory acceptance testing (FAT). Installation timelines depend on site readiness: a straightforward base-frame set with integral tank can be commissioned in 3–5 days, while a turnkey, noise-attenuated plant room with fuel system and exhaust stack may take 4–6 weeks. Our project managers provide a detailed Gantt chart at contract award so you can plan shutdowns and utility-tie-ins with confidence.

HEP
Book Online
(423) 819-7773