Harness pure Tennessee sunshine with HEP’s sustainable technology team right here in Rockwood. Our certified electricians combine decades of local know-how with cutting-edge panels, inverters, and smart-home monitoring to create a seamless solar installation that lowers your energy bills from day one. From the first site assessment to the moment your meter starts spinning backward, you’ll work with neighbors who genuinely care about your property, your savings, and our shared environment.
Whether you’re powering a lakeside cabin or a bustling Main Street storefront, we design every system to handle Rockwood’s unique weather patterns while maximizing federal and state incentives. Join the growing community of homeowners and businesses who trust HEP to make clean energy simple, reliable, and remarkably affordable—then watch the sun do the rest.
FAQs
Does Rockwood get enough sunlight for solar panels to be worthwhile?
Absolutely. Rockwood averages about 2,100–2,300 kWh of solar-irradiance per square metre each year—more than enough to justify a solar array. A properly sized 5 kW system can generate roughly 6,000 kWh annually, covering 60–100 % of a typical Rockwood home’s electricity use, depending on efficiency and lifestyle.
What incentives or rebates are currently available for solar installations in Rockwood?
Residents can apply for the federal Canada Greener Homes Grant (up to $5,000 toward solar) and the accompanying 10-year, interest-free Greener Homes Loan ($5,000–$40,000). Ontario’s Net-Metering Program also credits you at the full retail rate for every excess kilowatt-hour you export back to the grid, rolling those credits forward for up to 12 months. Municipal property-tax incentives may apply for high-performance homes—ask us for the latest local updates.
How long does the solar installation process take from signing a contract to final energization?
For a typical 6–10 kW residential project the timeline is 6–10 weeks. • Week 1–2: Site assessment, system design, and utility interconnection application. • Week 3–4: Permit approvals and equipment ordering. • Week 5: On-site installation—usually 1–3 days on the roof plus 1 day for electrical tie-in. • Week 6–8: Electrical inspection and utility meter swap. Once the bi-directional meter is in place, your array can be energized and start earning credits.
Will my solar array keep the lights on during a power outage?
A grid-tied solar array without batteries must shut off when the grid goes down for safety reasons. If you add a hybrid inverter and battery storage—such as the Tesla Powerwall or Enphase IQ Battery—your system can automatically isolate (island) from the grid and power critical loads (fridge, lights, Wi-Fi, sump pump) for several hours to several days, depending on battery capacity and sunlight.
Are solar batteries worth the extra investment in Rockwood?
Batteries add resilience and can increase self-consumption of solar power, but they do raise the upfront cost by 30–50 %. They make the most financial sense if you: 1) experience frequent outages, 2) want protection from rising time-of-use rates, or 3) plan to add an electric vehicle and charge it with solar energy at night. Our team can model payback scenarios so you can decide with real numbers.
What maintenance do solar panels require in Rockwood’s climate?
Solar modules are virtually maintenance-free: no moving parts and a 25-year power warranty. Rain and snowmelt usually keep the glass clean, but we recommend: • Visual check each spring for debris, shading or damage. • Annual production review via your monitoring app to spot any under-performing panels. • Professional electrical inspection every 3–5 years to test wiring and tighten connections. In winter, panels will shed most snow once the sun hits them; manual clearing is rarely needed and not advised unless safety can be ensured.