Oakdale’s industrial skyline never sleeps, and neither do the experts at HEP. From precision-engineered windings to rugged enclosures that laugh in the face of harsh environments, our team transforms raw potential into dependable power. Every unit is assembled in-house, tested to exceed ANSI and IEEE standards, and backed by technicians who know a midnight call is just part of keeping Oakdale’s production lines moving.

Whether you need rapid-deploy backup, custom-designed prime movers, or consulting that trims energy costs without trimming performance, HEP delivers generators that rise to every challenge. Join the manufacturers, hospitals, and data centers who already trust us to keep their lights—and futures—bright.

FAQs

What types of industrial generators does Progress Electrical supply in Oakdale?

We source and install a full range of industrial-grade generators, including diesel, natural-gas, and bi-fuel models from 20 kW to 2 MW. Our catalog features leading brands such as Cummins, Kohler, and Generac, ensuring reliable power for manufacturing plants, cold-storage warehouses, data centers, and municipal facilities across Oakdale.

How do I determine the correct generator size for my operation?

Our engineers perform an on-site load analysis that measures your peak and average kW demand, starting currents, motor loads, and any future capacity needs. Using this data, we produce a detailed sizing report and recommend a generator with at least a 20 % safety margin to handle surges without over-sizing, which keeps both capital and fuel costs under control.

Does Progress Electrical handle permitting and installation in Oakdale?

Yes. We offer turnkey service: site survey, concrete pad design, seismic anchoring, city and Stanislaus County permitting, electrical integration, fuel system installation, load-bank testing, and final commissioning. You receive a single point of contact from purchase through final acceptance, with all work performed to NEC, NFPA 110, and local code standards.

What maintenance plans are available after installation?

We provide three levels of preventive maintenance—Quarterly, Semi-Annual, and Annual—each including oil and filter changes, coolant checks, battery load tests, control panel diagnostics, and a full operational run. All plans come with 24/7 remote monitoring and priority response in the event of an alarm or outage.

How fast can you deliver and install a generator during an emergency outage?

For most in-stock units up to 500 kW, we can mobilize within 4 hours and have power online in as little as 24 hours, including temporary fuel setup. Larger or custom-spec units typically take 7-14 days. Our emergency team is on call 24/7, and we maintain a local inventory in Oakdale to minimize lead times.

Are financing, rental, or leasing options available?

Absolutely. We partner with several lenders to offer 36-, 60-, and 84-month financing packages, often with deferred first payments to align with your cash flow. Short-term and long-term rentals are also available for seasonal or project-based needs, and rental payments can be applied toward purchase if you decide to buy the unit later.