- HEP
- Panel Upgrade
Panel Upgrade
Panel Upgrade | Electric Panel Upgrades | Electrical | Morristown
Whether you’re renovating a historic Morristown charmer or loading up a new build with smart appliances, your home’s electrical backbone needs the muscle to match. HEP’s licensed electricians specialize in electric panel upgrades that raise capacity, banish nuisance breaker trips, and keep every circuit running safely. From a free on-site assessment to the final inspection sticker, we deliver code-compliant work that protects your property and boosts its value.
Our team handles permitting, utility coordination, and same-day clean-up, all backed by transparent pricing and a rock-solid workmanship guarantee. With HEP, you’ll enjoy steadier power for HVAC systems, EV chargers, workshops, and the tech you haven’t bought yet—plus the peace of mind that comes with a future-ready service panel. Call today and power tomorrow with confidence.
FAQs
Why would I need an electric panel upgrade in Morristown?
Older panels, usually 60-100 amps or those using fuses, were never designed to handle today’s appliance-heavy households. An upgrade boosts available amperage (typically to 150 – 200 amps), reduces nuisance breaker trips, increases home resale value, and ensures compliance with the latest National Electrical Code (NEC) and Morristown Municipal Code requirements.
How do I know if my current electrical panel is outdated or unsafe?
Warning signs include frequent breaker trips, lights that dim when large appliances start, visible rust or heat marks on the panel, a lack of open breaker spaces, or a panel manufactured by brands that have been recalled (e.g., Federal Pacific or Zinsco). A licensed Morristown electrician can perform a load calculation and visual inspection to confirm whether replacement is necessary.
What is involved in a typical panel upgrade process?
1) On-site assessment and load calculation; 2) Permit application with the Morristown Building Department; 3) Utility coordination to disconnect power on the scheduled day; 4) Removal of the old panel, meter socket (if required), and service entrance conductors; 5) Installation of a new 150- or 200-amp panel, breakers, grounding, and surge protection; 6) Rough and final inspections; 7) Utility reconnection and full system testing. Most projects are completed in one day.
Do I need a permit and inspection for an electric panel upgrade in Morristown?
Yes. The Town of Morristown requires an electrical permit, and the work must be performed by a state-licensed electrician. After installation, a municipal inspector verifies NEC compliance, proper grounding/bonding, and labeling before the utility can permanently re-energize the service.
How long will my power be off during the upgrade?
While the total job may span 6-8 hours, the full-home power outage typically lasts 3-6 hours. Critical loads such as refrigerators can be temporarily powered with a generator or extension from a neighbor if pre-arranged with the electrician.
How much does an electric panel upgrade cost in Morristown?
Pricing varies with amperage, wiring condition, meter relocation, and permit fees. On average, a straightforward 200-amp upgrade costs $2,000–$3,500, including parts, labor, permit, inspection, and utility coordination. Complex projects involving service entrance upgrades or rewiring can run $4,000–$6,000 or more. Request a detailed quote to understand your exact costs.