- HEP
- Seamless Upgrades
Seamless Upgrades
Seamless Upgrades | Electric Panel Upgrades | Electrical | McDonald
If flickering lights, warm breakers, or constant resets are becoming the norm, it’s time to let HEP’s certified pros in McDonald step in. We specialize in electric panel upgrades that replace outdated, undersized, or unsafe equipment with modern panels engineered for today’s high-demand households. From the moment we arrive, you’ll notice our streamlined process: transparent upfront pricing, tidy workmanship that keeps drywall cuts to a minimum, and meticulous testing before we leave. Most projects are completed the same day, so you can get back to streaming, cooking, and charging without a second thought.
Choosing HEP means gaining a lifetime partner in electrical safety and efficiency. Our team handles permitting, utility coordination, and code compliance while offering optional surge protection and smart-home integrations for future-proof peace of mind. Schedule your free assessment today and discover how a seamless panel upgrade can power everything you love—quietly, reliably, and safely.
FAQs
Why might homeowners in McDonald need an electric panel upgrade?
Older homes in McDonald were often built with 60- or 100-amp panels that were never intended to power today’s high-demand appliances, HVAC systems, and electronics. If you experience frequent breaker trips, flickering lights, or if you plan to add major loads such as an EV charger, hot tub, or kitchen remodel, upgrading to a modern 200-amp (or larger) panel ensures your electrical system has the capacity and safety features required by current National Electrical Code (NEC) standards.
What is involved in Seamless Upgrades Electrical’s panel upgrade process?
Our certified electricians begin with a free on-site assessment to evaluate your existing service, calculate the new load, and identify any wiring or grounding corrections needed. We coordinate with the utility company, secure McDonald borough permits, and schedule an outage window. On installation day, we safely remove the old panel, upgrade service entrance cables, install the new main breaker panel or load center, label all circuits, and perform a full system test before restoring power. Most upgrades are completed in one day.
Will I need a permit or inspection for an electric panel upgrade in McDonald?
Yes. Allegheny/Washington County and the Borough of McDonald require an electrical permit and a final inspection for any service upgrade. Seamless Upgrades Electrical handles all paperwork, pays the permit fees on your behalf, and schedules both the utility disconnect/reconnect and borough inspection to make the process hassle-free for you.
How much does a typical panel upgrade cost?
Costs in McDonald generally range from $1,800 to $3,500 for a standard 200-amp upgrade, depending on factors such as panel brand, meter socket replacement, service mast repairs, grounding upgrades, and any code corrections inside the home. We provide a detailed, written estimate after the site visit so there are no surprises, and financing options are available for qualified homeowners.
How long will my power be off during the upgrade?
While the full job takes most of the day, the actual power outage is usually 3–6 hours. We coordinate the shut-off with Duquesne Light/WesPenCo (depending on your utility) to minimize downtime. Before the outage we advise homeowners to unplug sensitive electronics, fully charge mobile devices, and avoid opening refrigerators or freezers to keep food cold.
What warranties and safety assurances do you offer?
Every panel upgrade comes with a 5-year workmanship warranty and the manufacturer’s 10-year (or longer) equipment warranty. Our electricians are licensed, insured, and continuously trained on NEC updates. We install only UL-listed panels and breakers, use copper conductors unless otherwise specified, and provide a completed load calculation and inspection report for your records, ensuring long-term safety and insurance compliance.