- HEP
- Modernize Your Existing
Modernize Your Existing
Modernize Your Existing | Electric Panel Upgrades | Electrical | Manchester
Electric demands have skyrocketed with today’s smart appliances, home offices, and EV chargers—yet many Manchester homes still rely on panels built for a bygone era. HEP’s expert electricians make modernizing simple, safe, and surprisingly quick. Our electric panel upgrades replace overloaded fuse boxes and undersized breaker panels with state-of-the-art systems that boost capacity, eliminate nuisance tripping, and meet the latest NEC codes. You’ll enjoy steadier power, added protection against electrical fires, and the freedom to expand with solar, hot tubs, or any future tech you dream up.
From the first on-site assessment to the final inspection, we handle permits, precision installation, and cleanup, all while keeping you informed and your home powered. Choose the local team Manchester homeowners trust for transparent pricing, courteous service, and workmanship guaranteed for life. Ready to flip the switch on reliability? Schedule your consultation with HEP today and feel the difference a modern panel makes.
FAQs
Why should I consider upgrading the electrical panel in my Manchester property?
Older fuse boards and outdated breaker panels weren’t designed for today’s appliance-heavy lifestyles. An upgrade improves safety by reducing overload and fire risk, gives you the spare capacity needed for EV chargers, heat pumps and solar systems, and brings your installation in line with the latest 18th-Edition (BS 7671) wiring regulations—often required by insurers and mortgage lenders.
How can I tell if my home or business actually needs a panel upgrade?
Common warning signs include frequently tripping breakers, dimming or flickering lights, warm breaker switches, reliance on multiple extension leads, or a fuse box that still uses re-wireable fuses. In Manchester, any board lacking an RCD (Residual Current Device) or SPD (Surge Protection Device) will also fail current regulations, so an Electrical Installation Condition Report (EICR) that flags ‘C2’ or ‘FI’ codes is a clear indicator an upgrade is due.
What size electrical panel do most Manchester homes require today?
While every installation is calculated individually, a 100 A single-phase supply is the absolute minimum. Most modern households now opt for 150 A or 200 A consumer units to allow for kitchen refits, electric showers, garden offices and EV charging. If you are planning a heat pump or three-phase workshop machinery, we can liaise with Electricity North West to arrange a service head and meter upgrade to 3-phase 400 V.
What steps are involved in upgrading my consumer unit and how long will it take?
1) Free site survey and load assessment. 2) Confirm quotation, book date and obtain Part P / Building Control notification. 3) Isolate incoming supply (we coordinate with Electricity North West if a head seal needs removing). 4) Remove old board, test existing circuits, rectify any faults. 5) Fit new RCBO or dual-RCD consumer unit with SPD, label circuits and issue new circuit schedules. 6) Perform dead and live tests, energise, tidy cabling and reinsulate meter tails. Most domestic upgrades take 4–6 hours; larger or fault-prone installations may need a full day.
Will my power be off and do I need to arrange permits?
Expect a total power outage for roughly half the installation period. We schedule the work to keep critical appliances running as long as possible and provide temporary lighting if needed. All permits, Part P notifications and Building Control fees are handled by our NICEIC Approved Contractor status, and you’ll receive both the Electrical Installation Certificate (EIC) and Building Regulations Compliance Certificate for your records.
How much does an electrical panel upgrade cost in Manchester and what affects the price?
A straightforward domestic consumer-unit replacement in 2024 typically ranges from £480–£750 + VAT. Costs rise if: • more outgoing ways (circuits) are needed • tails and earthing require upsizing • remedial work is uncovered during testing • a three-phase board is specified • the meter position must be moved. All prices include NICEIC certification, Building Control notification and safe disposal of your old unit. Finance plans are available to spread the cost over 6–24 months.