Modern Electrical Panel

HEPModern Electrical Panel

Modern Electrical Panel | Electric Panel Upgrades | Electrical | Lancing

At HEP, we transform outdated breaker boxes into sleek, future-ready hubs that power every corner of your Lancing home. Our licensed electricians replace aging fuses, crowded circuits, and mystery wiring with modern technology that delivers consistent voltage, added capacity for EV chargers and heat pumps, and smarter surge protection. You’ll feel the difference the moment lights stop flickering, appliances run at full strength, and your whole system meets current safety codes.

Choose our electric panel upgrades and you’re choosing peace of mind. We schedule around your day, handle all permits, and leave your space cleaner than we found it—backed by transparent pricing and a rock-solid workmanship guarantee. From historic cottages near the seafront to new builds on the Downs, HEP keeps Lancing powered safely and efficiently. Book your free assessment today and see how easy it is to power up for tomorrow.

FAQs

Why would I need an electrical panel upgrade in Lancing?

Older fuse boxes and early consumer units were never designed to handle today’s load from EV chargers, heat-pump systems, induction hobs and home-office electronics. Upgrading to a modern 18th-Edition metal-clad consumer unit with RCBOs and surge protection improves safety, provides more circuits, reduces nuisance tripping and future-proofs your property for additional appliances or extensions.

What signs indicate my existing consumer unit is outdated or unsafe?

Warning signs include: re-wireable (porcelain) fuses instead of breakers; no RCD/RCBO protection; a wooden backing board; scorching, buzzing or a burning smell; constantly tripping breakers; circuits that are not labelled; or the panel being over 20–25 years old. A periodic inspection report (EICR) from a qualified electrician will confirm whether replacement is recommended.

How long does a typical panel upgrade take and will my power be off?

Most domestic upgrades in Lancing take one working day. Power is generally off for 3-6 hours while the old board is removed, the tails and earth upgraded, and the new unit wired, tested and certified. We schedule the changeover at a time that minimises disruption and can provide temporary power for critical equipment if required.

Do I need planning permission or building control approval for a panel upgrade in the UK?

You do not need planning permission, but under Part P of the Building Regulations any consumer-unit replacement in England must be notified to your local building control. When you hire a Part P-registered electrician (NICEIC, NAPIT, ELECSA etc.) they self-certify the work, issue an Electrical Installation Certificate and send the compliance notification on your behalf, so there is no extra paperwork for you.

How much does a modern electrical panel upgrade cost in Lancing and what affects the price?

A straightforward upgrade for an average three-bed home typically ranges from £450 to £700 including testing and Part P notification. Costs rise if you need additional circuits, relocation of the board, upgraded meter tails, main bonding, or extras such as surge-protection devices, arc-fault detection or a dedicated EV charger breaker. A free on-site survey lets us give a fixed quotation tailored to your property.

Why should I hire an NICEIC or NAPIT registered electrician for my panel upgrade?

A registered contractor is assessed annually for competence and must work to BS 7671 standards. They carry professional indemnity and public-liability insurance, notify Building Control, and issue certification that protects your home insurance and resale value. If any problem arises, you have access to an independent complaints procedure and work warranty, giving you peace of mind that the upgrade is safe, legal and future-proof.

HEP
Book Online
(423) 819-7773