- HEP
- Electrical System
Electrical System
Electrical System | Electric Panel Upgrades | Electrical | Kingston
From heritage limestone cottages near the waterfront to newly built condos downtown, Kingston homes all have one thing in common: a growing appetite for reliable power. If flickering lights, tripped breakers, or limited outlet capacity are holding you back from adding that EV charger, hot tub, or home office, it’s time to consider electric panel upgrades. Swapping out an outdated fuse box or undersized panel doesn’t just boost capacity—it safeguards your family, electronics, and investment against overloads and fire risks.
HEP’s master electricians make the process effortless. We handle permits, precise load calculations, and seamless coordination with Kingston Hydro, delivering a code-compliant panel that’s ready for today’s tech and tomorrow’s innovations. Expect transparent quotes, tidy workmanship, and a courteous team that treats your home like their own. Power up with confidence—book your electric panel upgrade with HEP and enjoy uninterrupted living on the Limestone City grid.
FAQs
What are the most common signs that my Kingston home needs an electric panel upgrade?
Frequent breaker trips, flickering lights, warm panel covers, lack of open breaker spaces, reliance on fuses instead of breakers, and recent additions of high-draw appliances (EV charger, hot tub, heat pump, etc.) all point to an undersized or outdated service panel. If your home still has a 60-amp or 100-amp panel—or if it was built before the mid-1990s—an upgrade to 200 amps is often recommended for both safety and capacity.
What does the electrical panel upgrade process typically involve?
1. Site assessment: A licensed electrician evaluates your existing service, overall load, and grounding/bonding. 2. Utility coordination: In Kingston, we file an Electrical Service Request with Kingston Hydro or Hydro One so the utility can disconnect and later reconnect power. 3. Permit & ESA notification: A permit is obtained, and the Electrical Safety Authority (ESA) is notified for inspection. 4. Panel replacement: Power is shut off, the old panel is removed, service conductors and grounding are upgraded as needed, and a new breaker panel (usually 200 A) is installed. 5. Inspection & re-energizing: ESA inspects the work; once approved, the utility reconnects service and power is restored. 6. Clean-up & labeling: Circuits are properly labeled, and you receive all documentation, including your ESA Certificate of Acceptance.
How long will my power be off during a panel upgrade?
Most residential panel upgrades in Kingston can be completed in one working day. Power is typically off for four to eight hours while the old panel is removed, wiring is transferred, and the new panel is inspected. If service conductors or meter bases need replacement, or if weather or utility scheduling delays occur, the outage can extend, but your electrician will give you advance notice so you can plan accordingly.
Do I need permits or inspections for a panel upgrade in Kingston?
Yes. The Electrical Safety Authority (ESA) requires a notification (permit) for any service or panel upgrade in Ontario. A Licensed Electrical Contractor must file the notification and arrange for an ESA inspector to verify the work meets the Ontario Electrical Safety Code. In addition, the local utility (Utilities Kingston or Hydro One, depending on your address) must be informed so they can safely disconnect and reconnect the service conductors. Hiring a licensed and insured contractor ensures all permits and inspections are handled correctly.
Will upgrading my electrical panel increase home value or reduce insurance premiums?
Insurance companies view modern breaker panels, especially 200-amp service with copper wiring and AFCI/GFCI protection, as lower-risk than older fuse or undersized panels. Many insurers offer reduced premiums or will only issue coverage once outdated panels are replaced. From a resale perspective, buyers and home inspectors look favorably on a recent panel upgrade because it supports future renovations, EV chargers, and energy-efficient heat pumps. Although an upgrade alone doesn’t directly boost appraised value, it can make your home more marketable and avoid negotiation setbacks.
How much does an electric panel upgrade cost in Kingston in 2024?
Costs vary with panel size, meter base condition, wiring upgrades, and utility coordination. A straightforward 100-amp to 200-amp breaker panel replacement generally ranges from $2,400 to $3,800 + HST. Projects requiring a new mast, meter base, service conductors, or relocation can run $4,000–$6,500. ESA notification fees (about $79–$150) and utility disconnection/reconnection charges are usually included in a turnkey quote from a Licensed Electrical Contractor. Ask for a detailed, written estimate that specifies equipment brand, permit costs, and warranty.