Industry-leading Expertise

HEPIndustry-leading Expertise

Industry-leading Expertise | Generators | Electrical | Johnson City

When the lights go out in Johnson City, homeowners and businesses turn to HEP because we know reliable power is more than a convenience—it’s peace of mind. Our master electricians specialize in sizing, installing, and maintaining generators that kick in the moment the grid drops, keeping your HVAC, medical devices, and critical data systems humming without a hiccup. From the first site inspection to the final load-bank test, we handle every detail with the precision that has made HEP an East Tennessee staple for over two decades.

What sets us apart is a blend of local know-how and industry-leading training. We partner with top manufacturers to offer ultra-efficient models that stand up to the region’s tough weather, and every unit we install is backed by 24/7 emergency service from technicians who live right here in the Tri-Cities. Whether you’re upgrading your current backup system or protecting a new build, HEP delivers turnkey power solutions that let you say, “One call, HEP does it all.”

FAQs

What size generator do I need for my home or business in Johnson City?

Generator capacity is determined by the total wattage of the appliances, HVAC systems, and critical equipment you want to keep running during an outage. For most residences in Johnson City, a 14–22 kW standby unit will cover essentials plus central air; light-commercial sites may require 25–150 kW or larger. We begin every project with a free load-assessment where our licensed electricians measure starting and running loads, factor in future expansion, and account for local voltage fluctuations caused by mountain-valley weather patterns. The result is a right-sized generator that avoids both overload shutdowns and costly oversizing.

How often should I schedule maintenance for my standby generator?

Standby generators should receive a full preventive-maintenance service every 12 months or after 100–150 run-hours, whichever comes first. In Johnson City’s humid climate, we also recommend a quick oil-level and battery check every 6 months. Our maintenance package includes oil and filter changes, spark-plug replacement, battery load-testing, valve adjustment, firmware updates, and a complete transfer-switch inspection. Regular service not only preserves the manufacturer’s warranty but also ensures your unit starts instantly during our frequent spring thunderstorms and winter ice events.

Do I need a permit or inspection to install a generator in Johnson City?

Yes. The City of Johnson City and Washington/Unicoi/Sullivan Counties require an electrical permit and, in many cases, a gas or propane permit before installation begins. After completion, a municipal or county inspector must verify that the unit, transfer switch, fuel lines, and grounding meet the 2023 National Electrical Code (NEC) and local amendments. Our team handles the entire permitting process, schedules inspections, and provides engineered load-calcs and site drawings, so you stay fully compliant without the paperwork headache.

How long does a typical generator installation take from start to finish?

For most residential projects, the timeline is 7–10 business days once permits are issued: 1 day for concrete pad or composite base placement, 1 day for delivery and set, 1–2 days for electrical and fuel connections, and a final 1-hour startup/inspection. Larger commercial systems can take 2–4 weeks due to custom switchgear, trenching, and coordination with Johnson City Power Board shut-offs. Weather delays are minimal because we use tenting and prefabricated wiring looms to keep work on schedule.

Which fuel type is best—natural gas, propane, or diesel—for Johnson City applications?

Natural gas is the most convenient for properties already served by Atmos Energy lines; it offers unlimited runtime and lower emissions. Propane (LP) is ideal for rural areas without gas service; modern 500-gallon tanks keep a 22 kW unit running for about 7 days at 50 % load. Diesel is preferred for large commercial or industrial generators above 60 kW because of its high energy density and rapid torque response. We evaluate fuel availability, runtime requirements, environmental regulations, and total cost of ownership before recommending the optimal option.

Are generators noisy, and what can be done to minimize sound levels?

Today’s residential standby generators average 65–70 dB(A) at 23 ft—about as loud as a central A/C unit. We comply with Johnson City’s 75 dB daytime and 70 dB nighttime limits by selecting low-RPM models, installing factory sound-attenuated enclosures, and positioning the unit at least 5 ft from property lines. For noise-sensitive neighborhoods or commercial settings, we offer additional acoustic barriers, critical-grade mufflers, and vibration-isolation pads that can reduce sound levels by another 5–8 dB.

HEP
Book Online
(423) 819-7773