When power interruptions threaten your bottom line, HEP steps in with dependable generators that keep Johnson City businesses humming. Our commercial-grade units are engineered to handle demanding electrical loads, safeguard sensitive equipment, and switch on automatically the moment the grid flickers—so your lights, servers, and production lines never skip a beat.

From precise load calculations and custom wiring to turnkey installation and 24/7 emergency support, our certified technicians manage every detail. We partner with leading manufacturers for optimal efficiency and back each system with proactive maintenance plans that extend lifespan and reduce downtime. Count on HEP to deliver the reliable energy security your operation deserves—because in Johnson City, business moves fast, and the power should too.

FAQs

What size generator does my Johnson City business need?

The correct generator size depends on the total electrical load you want to support during an outage. We begin with a load study that measures your peak kW and kVA demands, then add a safety margin for startup surges, HVAC, and future expansion. For small retail locations this can be 30–60 kW, while manufacturing facilities or medical centers may require 150–500 kW or more. A professional assessment ensures the generator is neither under- nor over-sized, optimizing both reliability and operating cost.

Are there local codes or permits required to install a commercial generator in Johnson City, TN?

Yes. Washington County follows the 2017 National Electrical Code (NEC) with local amendments. Commercial generator projects must obtain an electrical permit from the City of Johnson City’s Building Division, pass a site inspection, and comply with noise ordinances (typically ≤70 dB at the lot line). If the unit is over 250 gallons of diesel or propane storage, the Johnson City Fire Marshal must approve the fuel tank location. Our team handles the permitting process, drawings, and scheduling of inspections on your behalf.

How often should I service my commercial generator?

Most manufacturers recommend preventive maintenance every 6 months or 200 engine hours, whichever comes first. In Johnson City’s humid climate, oil and filter changes, coolant analysis, and battery testing are critical. We also perform an annual load-bank test to verify the generator can carry its rated capacity. Enrolling in a maintenance contract reduces unplanned downtime and keeps your warranty valid.

Can the generator be integrated with my existing electrical system without shutting down operations?

Yes. We install an automatic transfer switch (ATS) that senses utility loss and switches loads to generator power in seconds, then back to utility when it returns. For tie-in work, we schedule hookups during off-peak hours or coordinate temporary power so your business remains operational. Our electricians follow NFPA 70E safety standards and provide a detailed cut-over plan before any work begins.

What fuel options are available, and which is best for Johnson City businesses?

Commercial generators commonly run on diesel, natural gas, or propane. Diesel offers high power density and is ideal for large loads, but requires on-site fuel storage and periodic polishing. Natural gas taps directly into Johnson City’s municipal line, eliminating refueling, but may be disrupted in rare utility outages. Propane stores well and burns cleanly, making it suitable for smaller or rural sites. We evaluate availability, runtime requirements, emission goals, and budget to recommend the optimal fuel type.

How long does generator installation take, and will it disrupt my business?

A typical commercial installation spans 4–8 weeks from signed contract to commissioning. The timeline includes permitting (1–2 weeks), concrete pad curing (1 week), delivery & set-in-place (1 day), electrical/gas connections (2–4 days), and final testing. Actual power interruptions are limited to short, scheduled switchover periods—usually less than one hour—and can be arranged after business hours. We provide a detailed schedule so you can plan staff and operations accordingly.