Solar Energy

HEPSolar Energy

Solar Energy | Solar Installation | Electrical | Collegedale

Harness the abundant Tennessee sunshine with HEP Energy’s expert solar installation services in Collegedale. Our licensed electricians design and mount high-efficiency panels that seamlessly integrate with your home’s existing electrical system, driving down utility bills while boosting property value. From the first site evaluation to flipping the switch on clean power, we handle every detail—permits, HOA paperwork, inspections—so you can watch your meter spin backward without lifting a finger.

What sets us apart is the personal touch: real, local professionals who live in the communities we serve and answer the phone when you call. Whether you’re motivated by sustainability, energy independence, or long-term savings, we tailor each solar installation to your roof, your budget, and your goals. Join the growing number of Collegedale neighbors enjoying lower costs and a brighter, greener future with HEP.

FAQs

Does Collegedale get enough sunshine for solar panels to be worthwhile?

Yes. Collegedale averages about 4.5–5.0 peak sun-hours per day throughout the year, which is on par with much of the Southeast. A well-designed 6-kW residential array can produce roughly 8,000–9,000 kWh annually—close to the average household’s yearly use. Modern high-efficiency panels also perform well in our partly-cloudy spring and fall months, so solar remains cost-effective even when the sky isn’t perfectly clear.

What incentives or rebates are available to Collegedale homeowners and businesses who go solar?

1. Federal Solar Investment Tax Credit (ITC) – 30 % of the installed cost can be claimed against your federal income tax through 2032. 2. TVA Green Connect – Tennessee Valley Authority provides a one-time $500 rebate for qualifying installations and streamlines interconnection for local EPB/Volunteer Energy Cooperative customers. 3. Sales-tax exemption – Tennessee waives the 7 % state sales tax on most solar equipment. 4. Property-tax exemption – Solar improvements are 100 % exempt from property-tax assessments in Hamilton County, so your tax bill will not rise when you add panels. 5. Accelerated depreciation (MACRS) – Businesses can depreciate 100 % of the system in year one, creating significant cash-flow benefits.

What is the step-by-step solar installation process with your company in Collegedale?

1. Free Solar Assessment – We analyze your roof, bills, and goals using satellite shading models and on-site measurements. 2. Custom Proposal – You receive a fixed-price quote, 25-year production estimate, and financing options within 48 hours. 3. Permitting & TVA Interconnection – Our team prepares engineering drawings, obtains the City of Collegedale building permit, and submits the TVA Green Connect interconnection application. This paperwork phase usually takes 2-3 weeks. 4. Installation – A typical 7-kW residential system is installed in 1–2 days by our NABCEP-certified crew. All wiring is completed by Tennessee-licensed electricians. 5. Inspection & Utility Swap – City inspectors approve the work; then TVA installs a bidirectional meter so you can export surplus power. 6. Activation & Monitoring – We walk you through your monitoring app and enroll the system in our 24/7 performance portal.

Will my solar panels provide power during a utility outage?

Standard grid-tied solar arrays shut down automatically when the grid goes down to protect line-workers (a UL-1741 requirement). If you want backup power, we can add a battery system—usually 10–20 kWh of lithium-ion storage—along with an automatic transfer switch. During an outage, the battery keeps critical loads (refrigerator, lights, Wi-Fi, medical equipment, etc.) running and the panels continue to recharge the battery each day. If you choose not to install batteries now, the system can be designed to be “battery-ready,” allowing you to add storage later without replacing inverters or rewiring.

How long will the entire solar project take and what local permits are required?

From signed contract to switch-on, most Collegedale residential projects complete in 6–8 weeks: • Engineering & Permitting – 2–3 weeks (City of Collegedale Building Inspection Division and Hamilton County electrical permit). • Equipment Procurement – 1 week (we stock most panels/inverters locally). • On-site Installation – 1–2 days. • Final Inspection & TVA Meter Swap – 2–3 weeks, depending on inspector and utility schedules. Commercial systems (rooftop or ground-mount) may take 8–12 weeks because of additional structural reviews and TVA demand-response studies.

What maintenance is required and what warranties do you provide?

Solar PV systems are largely maintenance-free—there are no moving parts. Rain usually keeps panels clean; if pollen buildup becomes visible, a quick rinse with a garden hose is sufficient. We recommend an electrical inspection and data check every 5 years, which we perform at no charge for customers. Our systems include: • 25-year manufacturer’s warranty on panels (minimum 84 % power output in year 25). • 25-year warranty on microinverters or 12-year standard/25-year extended on string inverters. • 10-year workmanship warranty covering roof penetrations, wiring, and racking. • 24/7 web monitoring with automated alerts—if production falls below threshold, we are notified and schedule service, usually within 48 hours.

HEP
Book Online
(423) 819-7773