Rigorous Safety Standards

HEPRigorous Safety Standards

Rigorous Safety Standards | Solar Installation | Electrical | Altamont

At HEP in Altamont, every solar installation begins long before panels meet the roof. Our licensed electricians map out load calculations, lock-out/tag-out procedures, and fall-protection plans with the same precision we bring to our hospital and industrial projects. From the first bolt to the final continuity test, we meet or exceed NEC, OSHA, and local permitting requirements, documenting each step so homeowners and inspectors see exactly how safety has been woven into their system.

That rigor pays off for decades. Proper torque values, weather-tight conduit runs, and triple-checked grounding keep arrays performing efficiently and protect the home behind the meter. With HEP you gain clean energy, lower utility costs, and the peace of mind that comes from knowing every wire, connector, and kilowatt was installed under the most exacting safety standards in Altamont.

FAQs

What safety certifications do your electricians and solar installers hold in Altamont?

Every field technician who works on your project is a state-licensed electrician or NABCEP-certified PV installer. In addition, all crew members maintain current OSHA 30 construction-safety cards, are trained in NFPA 70E electrical-safety practices, and receive annual refreshers on CPR/First Aid. These credentials ensure that everyone on your roof or at your electrical panel understands both the technical and safety requirements of a modern solar installation.

How do you guarantee compliance with local and national electrical codes during installation?

Before we ever set foot on your property we submit sealed engineering plans that reference the latest National Electrical Code (NEC 2023), the California Electrical Code amendments adopted by Altamont, and any utility-specific interconnection rules. Our in-house master electrician reviews every conductor size, over-current device, rapid-shutdown circuit, and grounding route. During the build, a dedicated quality-control lead checks each step against a 150-point safety checklist. Finally, city inspectors and the utility perform their own independent inspections before the system is energized.

What personal protective equipment (PPE) do your crews use while working on my roof?

Installers wear Class E hard hats, ANSI-rated safety glasses, cut-resistant gloves, and high-traction footwear at all times. When working at height they are tied off with OSHA-compliant fall-arrest systems (full-body harness, shock-absorbing lanyard, and anchored lifelines) that meet or exceed OSHA 1926 Subpart M. For electrical tasks, insulated tools and arc-flash-rated clothing are used in accordance with NFPA 70E tables for the calculated incident-energy level.

How do you minimize fire risks associated with photovoltaic systems?

We only install UL 2703- and UL 1703-listed modules and racking, use 90 °C wet-rated conductors in sunlight-resistant conduit, and follow NEC 690.12 rapid-shutdown requirements so first responders can de-energize the array from ground level. All penetrations are sealed with fire-rated flashing, and combiner boxes are placed on non-combustible backboards with proper clearances. Our teams torque every DC connection to manufacturer specs and perform thermal-imaging scans before commissioning to verify there are no hot spots.

What measures do you take to protect my home and family during installation?

We begin each day with a Job Hazard Analysis to identify site-specific risks and communicate them to the crew. Drop cloths and plywood protect landscaping and walkways, while interior access is limited to a single, dust-controlled pathway when we connect the inverter to your service panel. Noise-producing tasks are scheduled during reasonable hours, and we keep emergency egress routes clear for your household at all times. A site supervisor is on-site to address any concerns immediately.

Do you offer ongoing safety inspections or maintenance after the system is installed?

Yes. Your system includes a complimentary one-year safety audit where we re-torque mechanical fasteners, re-test insulation resistance, and verify all ground-fault and rapid-shutdown functions. After that, you can enroll in our SafeSolar™ Maintenance Plan, which provides annual visual inspections, IV-curve testing, and remote monitoring alerts. Keeping the system maintained not only preserves performance but also ensures long-term electrical and fire safety.

HEP
Book Online
(423) 819-7773