Industrial Applications

HEPIndustrial Applications

Industrial Applications | Generators | Electrical | Coalmont

When the power stakes are high in Coalmont’s demanding industrial sector, HEP delivers confidence. Our seasoned electricians design, install, and maintain robust generators that keep mines humming, sawmills slicing, and fabrication lines forging ahead—no matter what the grid throws their way. We work hand-in-hand with plant managers to size systems precisely, integrate smart controls, and schedule preventive service that minimizes downtime and maximizes ROI.

From rapid-response emergency units to high-capacity, continuous-duty installations, every project is backed by meticulous testing and 24/7 local support. Trust HEP to engineer the silent hero behind your operations—power that starts when you need it, stays steady under load, and scales with your growth.

FAQs

What types of industrial generators are best suited to Coalmont’s climate and elevation?

Coalmont sits at roughly 1,800 ft (550 m) above sea level and experiences wide seasonal temperature swings, high summer humidity, and occasional severe storms. For these conditions we generally recommend Tier-3 or Tier-4-Final diesel generators with advanced turbo-charging that compensates for thinner air at higher elevations. Enclosures should be NEMA 3R or better with corrosion-resistant powder coating to handle humidity and rain. Sound-attenuated, weather-proof canopies are also advisable to protect components from rapid temperature changes that can lead to condensation inside the alternator windings.

How do I determine the correct generator size and capacity for my industrial facility?

Begin by listing every load that must be powered during an outage—motors, HVAC, lighting, process equipment, IT systems, and safety controls. Record each item’s running kW, starting (in-rush) kVA, phase, and power factor. Next, decide which loads are mission-critical and which can be shed or sequenced. Our engineers then perform a load-step analysis and apply a 20 % growth factor to accommodate future expansion. For most industrial customers this results in a generator sized at 115 %–125 % of the calculated running load, ensuring headroom for motor starts without excessive oversizing that wastes fuel.

Do I need permits or inspections to install an industrial generator in Coalmont, Tennessee?

Yes. Grundy County follows the 2020 National Electrical Code (NEC) and requires an electrical permit and inspection for any standby power system above 25 kW. If the unit is diesel-powered and the belly tank exceeds 60 gal, a separate fire marshal inspection is required for fuel storage. Noise ordinances are lenient in industrial zones, but OSHA 29 CFR 1910 subpart S still applies to wiring methods. Our project managers handle all paperwork, coordinate with the county inspector, and supply load-bank test data to expedite final approval.

What fuel options do you offer and how do operating costs compare?

We supply diesel, natural-gas, and bi-fuel (diesel pilot with NG assist) generator sets from 40 kW to 2.5 MW. Diesel units have the highest power density and lowest upfront cost, but fuel storage and polishing add to lifetime expense. Natural-gas generators have slightly higher capital cost yet save 20 %–35 % in fuel costs where pipeline gas is available in Coalmont. Bi-fuel systems offer the reliability of diesel ignition with lower NOx emissions and can cut fuel costs by 15 % versus straight diesel. Our total-cost-of-ownership calculators factor in runtime hours, local utility rates, and preventive maintenance to recommend the most economical option.

How often should my industrial generator be serviced and what does maintenance include?

For 24/7-readiness we follow NFPA 110 Level 1 standards: weekly visual inspections, monthly no-load exercise, and quarterly oil-sample analysis. Full preventive maintenance occurs every 250 service hours or annually, whichever comes first, and includes oil and filter change, coolant check, belt tensioning, battery load test, alternator insulation resistance test, and a minimum 2-hour load-bank run at 80 % rated capacity. A major service at 3,000 hours adds injector calibration and valve lash adjustment. We provide computerized service logs for compliance and warranty validation.

Can your generators integrate with my existing power-management and remote-monitoring systems?

Absolutely. All of our industrial units ship with digital controllers (Deep Sea, Woodward, or Cummins PowerCommand) that support Modbus RTU/TCP, SNMP, and BACnet IP. This allows seamless tie-in to SCADA, building-management systems, or cloud monitoring platforms. For customers without an existing network, we offer LTE and satellite gateways that deliver real-time status, fuel-level alerts, and predictive maintenance analytics accessible from any web browser. Integration is configured during commissioning so you can monitor voltage, frequency, run hours, and alarms alongside your other plant metrics.

HEP
Book Online
(423) 819-7773